Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1460.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

May 14, 2022     Wingtip rib flanges - (3 hours)       Category: Wings
Fabbed two small angles to replace the ones I removed from the wingtip rib to prevent interference with the hinges. Got the fit wrong on the first, but was able to use it for the other wingtip and made the second correctly. Marked, drilled, deburred and match drilled to each wingtip rib. Gonna have to use the right angle drill to match drill the flanges to the wingtips in tight quarters. We'll see how that goes.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.